Back to Global FoodMate |Add To Favorites | Browse
regular members

Time Delay Tap

Time Delay Tap

Saturday,Nov 23, 2024
About Us
Product category
  • No categories temporary
Search
 
Certifications
  • not upload temporary
Friendly link
Current position:Homepage » About Us
About Us
 Stainless steel processing and welding time need to pay attention to several points
1. To maintain a good working environment.
2. Must not be worn when welding Time Delay Tap processing professional glue glove, because at the time of welding temperature, gel gloves by high temperature melt easily. 3. In the process of welding, don't use hand to touch the tool. 4. Stainless steel material, stainless steel plate should be moved to the dedicated facilities under the expected, it is strictly prohibited in the stainless steel material cutting blanking directly on crib.
5. Using manual arc welding, two side should be 100 mm in joint range of spray coating, to easily remove splash.
6. Control of stainless steel pressure vessel weld repair times, there is a requirement for resistance to intergranular corrosion, weld repair after should still maintain the original requirements. 7. Stainless steel pressure stainless steel toilet vessel manufacturing should be independent and closed production workshop or special fixed production sites, should be strict isolation and carbon steel products. In the thick plate cutting operation, the user needs to pay attention to adjust the flame temperature, during the actual machining operations, contact with the plate type has certain difference, while the stainless steel squatting pan thickness of the plank standard is different also, if is of thin steel plate cutting, flame temperature not too high at this time, normal temperature can reach the melting point of steel plate, and in the medium plate processing, the flame temperature will increase to a certain standard, so that when the temperature can make steel melting, processing and to achieve.
Now demand is very big, thick plate cutting process in the various consumer processing factory in the end of the plank 'processing time will also try to prevent attacks plate deformation, etc, due to improper operation way now some processing work, or is not in accordance with the normal process to complete the sheet metal processing, sheet this time stainless steel shower tray can't reach the standard request, also don't agree with relevant operating standards.
So in our steel plate cutting on thick plate cutting, should inspect the processing of raw materials, observe the above materials are uneven area, and how much is the thickness of the plank, clarify the processing requirement, this way in determining the information before processing operations. Now a lot of material selection of steel processing units are ignored in the situation, and many steel plate production specifications and appearance actually have some discrepancy, so in order to guarantee the quality of processing the finished product, must pay attention to the selection of raw materials.
Company Profile:
Company Name: Time Delay Tap Legal Form: Corporation/Limited Liability Company ()
Country: Albania Company size: employees
Registered Capital: Privacy Year Established: 2001
Verification:  
Main Products: Time Delay Tap
Main Industy:
Others
comments:0  Related Comments