Back to Global FoodMate |Add To Favorites | Browse
regular members

Time Delay Tap

Time Delay Tap

Friday,May 03, 2024
Product category
  • No categories temporary
Search
 
Certifications
  • not upload temporary
Friendly link
Current Position:Homepage » welcome
Popular Products
About Us
 Stainless steel processing and welding time need to pay attention to several points
1. To maintain a good working environment.
2. Must not be worn when welding Time Delay Tap processing professional glue glove, because at the time of welding temperature, gel gloves by high temperature melt easily. 3. In the process of welding, don't use hand to touch the tool. 4. Stainless steel material, stainless steel plate should be moved to the dedicated facilities under the expected, it is strictly prohibited in the stainless steel material cutting blanking directly on crib.
5. Using manual arc welding, two side should be 100 mm in joint range of spray coating, to easily remove splash.
6. Control of stainless steel pressure vessel weld repair times, there is a requirement for resistance to intergranular corrosion, weld repair after should still maintain the original requirements. 7. Stainless steel pressure stainless steel toilet vessel manufacturing should be indepen... [More Information]
New Products